Welcome to our architectural FAQs for Aberdeen and Aberdeenshire.

This page answers the most common questions we receive about planning permission, design costs, building regulations, and project management. Whether you’re starting a home extension, working on a listed property, or planning a new build. These FAQs provide clear, location‑specific advice from AK architecture, a trusted residential practice in the North East of Scotland.

These architectural FAQs are designed to help homeowners in Aberdeen and Aberdeenshire better understand their design and construction options.

Last updated: 22/08/2025

How much does a home extension cost in Aberdeen & Aberdeenshire?

Extension costs vary depending on the size, complexity, and level of finish.

Starting prices are typically £2,000–£3,000 per m². This covers a high-quality residential extension.

At AK architecture, we provide itemised tendering packages to ensure pricing is both fair and transparent. This helps you understand exactly where your budget is going.

👉 See how this plays out in our Glazed Gable Home Extension project.
👉 Curious if an extension is the right move? Check out our blog post: Do You Really Need a Home Extension?

If you’re looking for advice on design, planning, or costs, our Aberdeen architecture FAQ has you covered.

Do I need planning permission for a home extension in Aberdeen & Aberdeenshire?

This is one of the most frequent queries we receive, and one of the most important topics in our Aberdeen architecture FAQs.

In most cases, the answer is yes — although some smaller extensions may fall under permitted development rights in Scotland.

However, this depends on the size, type, and location of your proposal. At AK architecture, we assess every project against the relevant Aberdeen City or Aberdeenshire Local Development Plan and advise you on the most suitable route forward.

👉 Want to know more? Visit our Planning & Applications page.

How long does it take to get planning approval?

The council usually decides planning applications within 8 weeks. We recommend allowing an extra 3–4 weeks to prepare drawings and supporting documents beforehand.

What’s the difference between planning permission and a building warrant?

Planning permission relates to the appearance, use, and impact of a building within its context. It ensures that the proposed works are acceptable in terms of design, scale, and planning policy.

A building warrant, on the other hand, confirms that the technical design and construction comply with the Scottish Building Standards.

Most projects require both approvals, though some may require only one. Depending on the nature and scope of the works.

Understanding the difference between planning permission and building warrants is a key part of most residential architectural FAQs for homeowners in Scotland.

At AK architecture, we manage both applications on your behalf. From design through to final decision. Ensuring full compliance and minimal delay.

Do you work with listed buildings and conservation areas in Aberdeen or Aberdeenshire?

Absolutely. We have extensive experience working with traditional granite properties, conservation zones, and securing listed building consent across Aberdeen and Aberdeenshire.

Recent examples include projects on Rubislaw Den North / South and Desswood Place. We combined high-quality design with a sensitive response to conservation area constraints. We also recently completed a B-listed building basement conversion and dormer extension, requiring careful coordination with heritage officers and statutory consultees.

Our portfolio includes work on other prestigious addresses such as Rubislaw Den North and South, Hamilton Place, and Union Street. All of which demanded a contextual, design-led approach to protect and enhance existing character.

While Victoria Cottage in Tillyfourie isn’t located within a conservation area, it showcases our ability to reimagine granite period homes in rural settings, combining tradition with bold contemporary interventions.

Projects like Victoria Cottage – Large Home Extension and Basement Conversion – Ferryhill Place are some examples.

Can I stay in my home during the renovation?

It depends on the scale and nature of the works. For minor extensions or internal refurbishments, many clients are able to stay in place with some adjustments to their routine.

However, for major structural alterations, particularly those involving roof works, floor replacements, or building services, we may recommend temporary relocation to minimise disruption.

Most importantly, it’s a matter of health and safety — ensuring that you, your family, and the contractor’s team are protected throughout the construction phase. We’ll always advise you clearly at each stage based on the scope of your project.

What are CDM Regulations, and what are my responsibilities as a client?

The Construction (Design and Management) Regulations 2015 (CDM Regulations) are a legal framework that governs health, safety, and welfare on construction projects in the UK.

As a domestic client, you still have duties under CDM — but these are typically transferred to your designer or principal contractor.

At AK architecture, we clearly explain these obligations and ensure you fulfil your responsibilities from the outset. For most residential projects, we act as Principal Designer, coordinating health and safety matters during design and pre-construction.

You are still legally responsible for appointing competent professionals and ensuring that roles such as Principal Designer and Principal Contractor are formally confirmed in writing.

We manage this process on your behalf and ensure that all parties involved comply with CDM requirements, including notification to the HSE where applicable. It’s all part of delivering a safe, compliant, and professionally managed project.

What areas do you cover in Aberdeen and Aberdeenshire?

We cover all areas across the North East of Scotland, including Aberdeen, Aberdeenshire, and surrounding towns and villages such as Banchory, Westhill, Aboyne, and Deeside, to name a few.
While our core practice is based in the North East, we’ve also delivered projects from one end of the country to the other. Including a contemporary new build in the Scottish Highlands and bespoke architectural work in West London. This broad range reflects our ability to adapt to both rural and urban contexts while maintaining a consistently high design standard.

These architectural FAQs are tailored for homeowners in Aberdeen and Aberdeenshire; however, they are applicable to other areas & regions.

What’s the first step in working with AK architecture?


Get in touch via our Contact Page to book a consultation.
We typically begin with a site visit and follow up with a tailored fee proposal.

Do you charge for the initial consultation?

We offer a free initial discovery call. Site visits are priced individually, depending on the project type and location.

If you’re looking for advice on design, planning, or costs, our Aberdeen architecture FAQ has you covered.

Still Got Questions?

If your question isn’t answered here. Please contact us directly — we’re happy to add to our architectural FAQs Aberdeen based on what matters to you.

More Frequently Asked Questions

What is a building warrant in Scotland?

A building warrant is formal approval from your local council confirming that proposed building work meets Scottish Building Standards. It is required before work begins on most significant building projects — extensions, loft conversions, garage conversions, structural alterations, and new buildings. Once work is complete, a Completion Certificate is issued. Building warrants are handled by the local authority’s Building Standards department — Aberdeen City Council in Aberdeen city, and Aberdeenshire Council for Aberdeenshire properties.

Do I need a building warrant for a house extension in Scotland?

Yes — almost all house extensions in Scotland require a building warrant. The warrant process ensures the extension meets standards covering structural stability, fire safety, insulation, drainage, and ventilation. You apply to your local council before work begins, and receive a Completion Certificate when work is signed off. AK Architecture prepares and submits the full building warrant package on your behalf, including coordination with a structural engineer where required.

How long does a building warrant take in Aberdeen or Aberdeenshire?

The statutory target for Scottish local authorities is 20 working days for straightforward applications. In practice, timescales vary depending on the complexity of the project and the completeness of the submission. A well-prepared application with all required drawings and structural information will typically be processed more quickly than an incomplete one. AK Architecture prepares detailed, thorough submissions to minimise back-and-forth and keep your project on track.

How much does a loft conversion cost in Aberdeen?

Loft conversion costs in Aberdeen typically range from £30,000 to £60,000 or more depending on the type of conversion, the size of the space, and the level of finish. A roof light conversion (adding Velux-type windows without altering the roofline) is usually at the lower end; a full dormer conversion adding significant headroom is more expensive. Architectural fees, building warrant costs, and structural engineering fees are additional. AK Architecture can give you a realistic cost guide during a free initial consultation.

How long does planning permission take in Aberdeen?

In Scotland, the statutory target for local planning authorities to decide householder planning applications is 2 months. Aberdeen City Council and Aberdeenshire Council both aim to meet this target, though complex applications or those requiring additional information can take longer. Applications that are well-prepared and comply with relevant planning policies are typically processed more smoothly. AK Architecture prepares and manages planning applications and liaises with the planning authority on your behalf throughout the process.

What is the difference between an architect and an architectural technologist?

An architect is registered with the Architects Registration Board (ARB) and typically holds a Part 1, Part 2, and Part 3 qualification. An architectural technologist is a member of the Chartered Institute of Architectural Technologists (CIAT) and specialises in the technical and construction aspects of architecture. Both can design buildings and manage planning and building warrant applications. Ashley Keenon of AK Architecture holds an Honours degree in Architectural Technology and has 19 years’ experience delivering residential projects in Aberdeen and Aberdeenshire.